Systems
Systems resulting from our innovative products

Industrial coating
Description

Because of its extremely good mechanical and chemical toughness this system is perfectly suitable for its use in industrial production and storage areas. On extremely uneven or rough areas a leveling layer is needed! For this the primer is mixed with our quartz grading curve SLD in the ratio of 1:1 parts by weight and spread with a scraper.

Primer: GI 110, GI 115 Drying time 8-12 h at 20 °C
Alternative: GI 118 (as a rapid primer under rigid coverings,
see product information) Drying time 4-6 h at 20°C
Consumption: 250-400 g/m²